I-25 SBL over Nogal Canyon

4.2 Mi N of Sierra CL · County 053, New Mexico · Built 1968 · 2 Lanes · 6,496 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000006777
Year Built
1968
Length
114.6 m (376 ft)
Max Span
80.8 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
6,496
Material
Steel
Design
Truss - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.