FL-5035 over North Diversion Channel
0.51 Mi E of I-25/Albuq · County 001, New Mexico · Built 1967 · 4 Lanes · 8,412 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
35.101336, -106.624558
This bridge is in worse condition than 80.8% of bridges in County 001. The average bridge in New Mexico is 0 years old; this one is 59 years old.
Nearby Bridges
IA-2226 over EBL & NBL Frontage R
Built 2002
IN-2226 over University Boulavard
Built 2002
I-40 EBL over I-25 NB Frontage Road
Built 2002
I-40 EBL over University Boulavard
Built 2002
IN-2226 over I25 I40 Frntg Rd Rmps
Built 2002
I-40 WBL over I-25 NB Frontage Road
Built 2002
I-40 WBL over University Boulevard
Built 2002
IG-2226 over I-40 SB & WB Frntage Rd
Built 2002
IT-2226 over I-25 NB Frontage Road
Built 2002
IN-2226 over University Boulavard
Built 2002
Bridge Details
- Structure #
- 000000000006775
- Year Built
- 1967
- Length
- 38.1 m (125 ft)
- Max Span
- 11.9 m
- Width
- 23.2 m (76.1 ft)
- Lanes
- 4
- Daily Traffic
- 8,412
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.