I-40 E/WBL over ALLISON RD
19.9 MI E OF ARIZ ST LINE · County 031, New Mexico · Built 1966 · 4 Lanes · 24,312 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
35.522703, -108.779497
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 60 years old.
Nearby Bridges
31-003A over RIO PUERCO
Built 2018
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1966
US-491 NB and SB over I-40 EB and WB @ 20.8
Built 2007
US-491 over NM118/BNSF RR/RIO PUERCO
Built 1974
I-40 EB/WBL over GAMERCO WASH
Built 1975
FL-5406 over GAMERCO WASH
Built 1987
31-Z017 over UNNAMED WATERWAY
Built 1950
I-40 WBL over BNSF R/R SPUR
Built 1980
I-40 EBL over BNSF R/R SPUR
Built 1980
FL-5407 over GAMERCO WASH
Built 1996
Bridge Details
- Structure #
- 000000000006730
- Year Built
- 1966
- Length
- 10.1 m (33.1 ft)
- Max Span
- 7.6 m
- Width
- 23.8 m (78.1 ft)
- Lanes
- 4
- Daily Traffic
- 24,312
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $298,000
- Total Project Cost
- $447,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.