FR-2130 over I-25 NBLS/SBLS
27.1 Mi N of Santa Fe C/L · County 047, New Mexico · Built 1966 · 2 Lanes · 554 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
35.395181, -105.323597
This bridge is in worse condition than 50.3% of bridges in County 047. The average bridge in New Mexico is 0 years old; this one is 60 years old.
Nearby Bridges
FR-2116 over BERNAL CREEK
Built 1941
47-B28A over TRES HERMANOS CREEK
Built 1930
47-B28A over UNNAMED WATERWAY
Built 2003
I-25 NBL/SBL/FRTG over UNNAMED WATERWAY
Built 1966
FR-2116 over UNNAMED WATERWAY
Built 1941
FR-2114 over UNNAMED WATERWAY
Built 1944
FR-2135 over TECOLOTE CREEK
Built 1941
I-25 NBL/SBL over LOCAL RURAL ROAD
Built 1967
I-25 SBL over Tecolote Creek
Built 1966
I-25 NBL over Tecolote Creek
Built 1966
Bridge Details
- Structure #
- 000000000006596
- Year Built
- 1966
- Reconstructed
- 2006
- Length
- 57.6 m (189 ft)
- Max Span
- 16.2 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 554
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $250,000
- Total Project Cost
- $440,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.