US-84 over RIO DEL OSO
1.5 MI N US-285/HERNANDEZ · County 039, New Mexico · Built 1964 · 2 Lanes · 11,253 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 4 | Poor |
Location
36.108514, -106.153364
This bridge is in worse condition than 94.3% of bridges in County 039. The average bridge in New Mexico is 0 years old; this one is 62 years old.
Nearby Bridges
US-84 over ARROYO DEL PALACIO
Built 1976
FR-8402 over UNNAMED WATERWAY
Built 1933
US-84 over UNNAMED WATERWAY
Built 1965
US-84 over ARROYO DELLAS LEMITAS
Built 1976
US-285 over RIO CHAMA
Built 1994
US-84/285 over UNNAMED WATERWAY
Built 1965
US-84/285 over ARROYO DE LA PRESA
Built 2003
US-84 over ARROYO DEL TORO
Built 1976
US-84/285 over UNNAMED WATERWAY
Built 1933
IRR/NM-74 over CHAMA RIVER
Built 1962
Bridge Details
- Structure #
- 000000000006481
- Year Built
- 1964
- Length
- 84.1 m (275.9 ft)
- Max Span
- 20.7 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 11,253
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $418,000
- Total Project Cost
- $627,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.