NM-400 over I-40 EBL/WBL mp 33.6
JUNCTION I-40/NM-400 · County 031, New Mexico · Built 1963 · 2 Lanes · 1,524 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
35.511344, -108.540892
This bridge is in worse condition than 79.2% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 63 years old.
Nearby Bridges
NM-400 over UNNAMED WATERWAY
Built 1963
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1958
NM-400 over RIO PUERCO
Built 1935
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1963
I-40 EBL over Rio Puerco
Built 1958
I-40 WBL over Rio Puerco
Built 1958
EAST ESACPE ROAD over UNKNOWN CREEK
Built 1943
NM-118 over BNSF Railroad
Built 1950
I-40 EBL/WBL over UNNAMED WATERWAY
Built 1963
CONNECTOR RD K & G over UNKNOWN CREEK
Built 2022
Bridge Details
- Structure #
- 000000000006367
- Year Built
- 1963
- Reconstructed
- 1987
- Length
- 71.9 m (235.9 ft)
- Max Span
- 23.2 m
- Width
- 9.6 m (31.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,524
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $410,000
- Total Project Cost
- $425,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.