US-60 over Bear Canyon

7.2 Mi W Jct US-60/I-25 · County 053, New Mexico · Built 1962 · 2 Lanes · 4,480 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000006358
Year Built
1962
Length
48.2 m (158.1 ft)
Max Span
18.3 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
4,480
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$244,000
Total Project Cost
$366,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.