I-40 EBL over RIO PUERCO

1.1 MI E OF ARIZ ST LINE · County 031, New Mexico · Built 1963 · 2 Lanes · 21,057 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000006296
Year Built
1963
Reconstructed
1985
Length
95.7 m (314 ft)
Max Span
29.3 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
21,057
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$661,000
Total Project Cost
$992,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.