I-40 EBL over SALT WATER WASH
11.4 M EAST OF ARIZ LINE · County 031, New Mexico · Built 1960 · 3 Lanes · 24,827 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
35.48, -108.909997
This bridge is in worse condition than 46.4% of bridges in County 031. The average bridge in New Mexico is 0 years old; this one is 66 years old.
Nearby Bridges
NM-118 over Salt Water Wash
Built 1949
I-40 EBL over RIO PUERCO OF THE WEST
Built 1959
I-40 WBL over RIO PUERCO OF THE WEST
Built 1950
I-40 WBL over SALT WATER WASH
Built 1960
31-Z001 over RIO PUERCO
Built 1994
31-Z001 over DEFIANCE DRAW
Built 2011
I-40 EBL over NM-118
Built 2007
I-40 WB over NM-118
Built 2007
31-0032 over SALT WATER WASH
Built 1997
NM-118 over UNNAMED WATERWAY
Built 1948
Bridge Details
- Structure #
- 000000000006131
- Year Built
- 1960
- Reconstructed
- 1985
- Length
- 42.1 m (138.1 ft)
- Max Span
- 14 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 3
- Daily Traffic
- 24,827
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.