FR-4012 over I-40 EBL/WBL @ mp 117.93

I-40 @ MESITA I/C MP117 · County 006, New Mexico · Built 1959 · 2 Lanes · 950 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000006121
Year Built
1959
Reconstructed
1987
Length
71.9 m (235.9 ft)
Max Span
19.8 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
950
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$358,000
Total Project Cost
$538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.