I-40 EBL over NM-556/Tramway Blvd

8.1 M E Jct I-40/I-25 · County 001, New Mexico · Built 1959 · 3 Lanes · 45,012 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000006103
Year Built
1959
Reconstructed
1999
Length
71.3 m (233.9 ft)
Max Span
19.2 m
Width
18.4 m (60.4 ft)
Lanes
3
Daily Traffic
45,012
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$790,000
Total Project Cost
$1,190,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.