NM-204 over UNNAMED WATERWAY
4.1 MI W OF US-64 · County 007, New Mexico · Built 1965 · 2 Lanes · 46 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
36.569975, -104.938942
This bridge is in worse condition than 96.4% of bridges in County 007. The average bridge in New Mexico is 0 years old; this one is 61 years old.
Nearby Bridges
US-64 over PONIL CREEK
Built 1971
US-64 over TURKEY CANYON
Built 1951
US-64 over UNNAMED WATERWAY
Built 1947
NM-21 over CIMARRON RIVER
Built 1954
US-64 over UNNAMED WATERWAY
Built 1938
US-64 over CERROSOSO CREEK
Built 1971
NM-21 over CIMARRONCITA RIVER
Built 1954
NM-58 over IRRIGATION CANAL
Built 1955
NM-21 over URRACA CREEK
Built 1965
07-C012 over CIMARRON RIVER
Built 1981
Bridge Details
- Structure #
- 000000000005969
- Year Built
- 1965
- Length
- 13.7 m (44.9 ft)
- Max Span
- 6.7 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 46
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $47,000
- Total Project Cost
- $70,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.