FR-4114 over I-40 EBL and WBL
20.7 M E Jct I-40/ NM-129 · County 037, New Mexico · Built 1958 · 2 Lanes · 279 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
35.118997, -103.893883
This bridge is in worse condition than 94.1% of bridges in County 037. The average bridge in New Mexico is 0 years old; this one is 68 years old.
Nearby Bridges
FR-4102 over I-40 EBL/WBL
Built 1958
I-40 WBL over Blanco Creek
Built 1958
I-40 EBL over Blanco Creek
Built 1958
I-40 EBL over UNNAMED WATERWAY
Built 1961
I-40 WBL over UNNAMED WATERWAY
Built 1961
FR-4102 over UNNAMED WATERWAY
Built 1936
I-40 EBL over UNNAMED WATERWAY
Built 1961
I-40 WBL over UNNAMED WATERWAY
Built 1961
FR-4102 over UNNAMED WATERWAY
Built 1936
I-40 EBL over I-40 FRONTAGE ROAD
Built 1971
Bridge Details
- Structure #
- 000000000005953
- Year Built
- 1958
- Length
- 64.6 m (211.9 ft)
- Max Span
- 16.8 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 279
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $690,000
- Total Project Cost
- $1,640,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.