NM-567 over RIO GRANDE
6.1 Mi Jct NM-68/NM-570 · County 055, New Mexico · Built 1957 · 2 Lanes · 437 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
4
Poor
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 4 | Poor |
Location
36.336128, -105.733842
This bridge is in worse condition than 89.2% of bridges in County 055. The average bridge in New Mexico is 0 years old; this one is 69 years old.
Nearby Bridges
NM-570 over UNNAMED WATERWAY
Built 1990
NM-68 over UNNAMED WATERWAY
Built 1959
NM-68 over UNNAMED WATERWAY
Built 1959
NM-68 over PIEDRA LUMBRE CANYON
Built 1940
55-0108 over RIO GRANDE RIVER
Built 1965
NM-570 over RITO CIENEQUILLA
Built 1974
NM-68 over UNNAMED WATERWAY
Built 1940
NM-240 over RIO PUEBLO DE TAOS
Built 1997
55-090 over RIO GRANDE DE RANCHOS
Built 1984
55-Z082 over RIO GRANDE DE RANCHO
Built 1935
Bridge Details
- Structure #
- 000000000005826
- Year Built
- 1957
- Length
- 46.6 m (152.9 ft)
- Max Span
- 30.5 m
- Width
- 6.1 m (20 ft)
- Lanes
- 2
- Daily Traffic
- 437
- Material
- Steel
- Design
- Truss - Thru
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $137,000
- Total Project Cost
- $206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.