NM-1 over UNNAMED WATERWAY
11.1 M E&N/SAN MARCIAL EX · County 053, New Mexico · Built 1933 · 2 Lanes · 174 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.816558, -106.886953
This bridge is in worse condition than 61.9% of bridges in County 053. The average bridge in New Mexico is 0 years old; this one is 93 years old.
Nearby Bridges
Gravel Road over Low Flow Channel
Built 1995
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1963
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1963
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1963
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1963
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1963
I-25 NBL/SBL over UNNAMED WATERWAY
Built 1963
NM-1 over UNNAMED WATERWAY
Built 1943
NM-1 over UNNAMED WATERWAY
Built 1931
NM-1 over UNNAMED WATERWAY
Built 1931
Bridge Details
- Structure #
- 000000000002595
- Year Built
- 1933
- Length
- 8.1 m (26.6 ft)
- Max Span
- 7.6 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 174
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $29,000
- Total Project Cost
- $44,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.