NM-293 over UNNAMED WATERWAY
3.1 M. NORTH OF JUNCTION · County 017, New Mexico · Built 1920 · 2 Lanes · 257 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.005703, -108.568386
This bridge is in worse condition than 70.7% of bridges in County 017. The average bridge in New Mexico is 0 years old; this one is 106 years old.
Nearby Bridges
NM-153 over UNNAMED WATERWAY
Built 1949
NM-293 over UNNAMED WATERWAY
Built 1949
NM-153 over NORTHRUP CANYON
Built 1949
NM-211 over GILA RIVER
Built 1973
NM-211 over DUCK CREEK
Built 1969
US-180 over UNNAMED WATERWAY
Built 1965
US-180 over LOBO CANYON
Built 1966
US-180 over GILA RIVER
Built 1966
NM-211 over POPE CANYON
Built 1943
17-C071 over DUCK CREEK
Built 1983
Bridge Details
- Structure #
- 000000000001891
- Year Built
- 1920
- Length
- 20.5 m (67.3 ft)
- Max Span
- 7 m
- Width
- 6.8 m (22.3 ft)
- Lanes
- 2
- Daily Traffic
- 257
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $504,000
- Total Project Cost
- $589,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.