NM-1 over RYAN HILL CANYON

2.7 M E&N SAN MARCIAL · County 053, New Mexico · Built 1931 · 2 Lanes · 174 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000001648
Year Built
1931
Length
92.2 m (302.5 ft)
Max Span
7.6 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
174
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,280,000
Total Project Cost
$2,654,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.