RAMP F over GSP NB&SB ORATON PKWY

AT GSP & RT 280 JCT · County 013, New Jersey · Built 1964 · 1 Lanes · 10,138 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
361470T
Year Built
1964
Length
94.5 m (310 ft)
Max Span
32.3 m
Width
6.7 m (22 ft)
Lanes
1
Daily Traffic
10,138
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$595,000
Total Project Cost
$995,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.