GSP RAMP 145SBX over RAMP F&K-GSP SB.EXIT

AT GSP & RT 280 JUNCTION · County 013, New Jersey · Built 1964 · 1 Lanes · 10,138 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
361470A
Year Built
1964
Length
222.8 m (731 ft)
Max Span
222.8 m
Width
6.8 m (22.3 ft)
Lanes
1
Daily Traffic
10,138
Material
Concrete
Design
Slab
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$4,113,000
Total Project Cost
$6,869,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.