I-80 EB over NORTH MAIN ST. (CR 634)

0.5 MI W OF NJ 15 · County 027, New Jersey · Built 1959 · 4 Lanes · 53,900 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
1412176
Year Built
1959
Length
21.3 m (69.9 ft)
Max Span
19.8 m
Width
17.6 m (57.7 ft)
Lanes
4
Daily Traffic
53,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$300,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.