NJ 15 SB over RAMP TO NJ 15 NB

0.43 MI. N. OF I-80 · County 027, New Jersey · Built 1943 · 4 Lanes · 51,992 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
1404151
Year Built
1943
Length
16.5 m (54.1 ft)
Max Span
15.5 m
Width
19.1 m (62.7 ft)
Lanes
4
Daily Traffic
51,992
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$78,000
Total Project Cost
$159,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.