THIRD STREET over MORRISTOWN LINE MP 8.67

1.3 MI East of GSP · County 013, New Jersey · Built 1905 · 1 Lanes · 925 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0765166
Year Built
1905
Reconstructed
2008
Length
14.9 m (48.9 ft)
Max Span
14 m
Width
16.5 m (54.1 ft)
Lanes
1
Daily Traffic
925
Material
Prestressed Concrete
Design
Slab
Owner
Unknown
Last Inspected
N/A
Est. Improvement
$2,311,000
Total Project Cost
$8,664,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.