Second Street over Morristown Line MP 8.62

1.3 MI East of GSP · County 013, New Jersey · Built 1905 · 2 Lanes · 914 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0765165
Year Built
1905
Reconstructed
2005
Length
14.3 m (46.9 ft)
Max Span
13.7 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
914
Material
Prestressed Concrete
Design
Slab
Owner
Unknown
Last Inspected
N/A
Est. Improvement
$2,216,000
Total Project Cost
$8,311,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.