NH112 LOST RIV RD over LOST RIVER

1.9 MI W OF JCT RT 118 · County 009, New Hampshire · Built 1957 · 2 Lanes · 1,677 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
028401030013500
Year Built
1957
Reconstructed
1998
Length
19.8 m (65 ft)
Max Span
18.3 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
1,677
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.