NH 31 over SOUHEGAN RIVER

.3 MI FROM GREENVILLE TL · County 011, New Hampshire · Built 1951 · 2 Lanes · 4,552 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
027700770005200
Year Built
1951
Length
18 m (59.1 ft)
Max Span
17.1 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
4,552
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.