NH123 NH124 over SOUHEGAN RIVER BYP HIST

1.4 MI FROM GREENVILLE TL · County 011, New Hampshire · Built 2015 · 2 Lanes · 5,564 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
018601560009400
Year Built
2015
Length
50.9 m (167 ft)
Max Span
48.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
5,564
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.