DEER MEADOW ROAD over DEER MEADOW BROOK

1.90MI CONCORD TL · County 013, New Hampshire · Built 1935 · 2 Lanes · 569 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
026801400007000
Year Built
1935
Length
9.1 m (29.9 ft)
Max Span
7.9 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
569
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.