NH127 over WARNER RIVER

.5 MI WEBSTER T.L. · County 013, New Hampshire · Built 1937 · 2 Lanes · 1,581 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Serious
Deck
3
Serious
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
026302540018000
Year Built
1937
Length
37.5 m (123 ft)
Max Span
18.3 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
1,581
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.