NH103 over I-89 NB

3.6 MI N. HOPKINTON T.L. · County 013, New Hampshire · Built 1966 · 2 Lanes · 1,372 vehicles/day

Overall
Fair
Deck
9
Excellent
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
026302020013600
Year Built
1966
Reconstructed
1993
Length
24.7 m (81 ft)
Max Span
22.9 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
1,372
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.