I-89 SB over NORTH VILLAGE ROAD

5.2 MI HOPKINTON T.L. · County 013, New Hampshire · Built 1966 · 2 Lanes · 10,849 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
026301850011200
Year Built
1966
Reconstructed
1993
Length
20.1 m (65.9 ft)
Max Span
18.6 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
10,849
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.