I-89 SB over WARNER RIVER

6.2MI HOPKINTON T.L. · County 013, New Hampshire · Built 1966 · 3 Lanes · 13,402 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
026301660010300
Year Built
1966
Reconstructed
1992
Length
58.2 m (190.9 ft)
Max Span
20.1 m
Width
18.7 m (61.4 ft)
Lanes
3
Daily Traffic
13,402
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.