NH103 over WARNER RIVER

0.1 MI FROM JCT I-89 · County 013, New Hampshire · Built 1936 · 2 Lanes · 3,778 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
026301450005300
Year Built
1936
Reconstructed
1991
Length
24.7 m (81 ft)
Max Span
21.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,778
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.