NH103 over WARNER RIVER

SUTTON TL · County 013, New Hampshire · Built 1936 · 2 Lanes · 3,778 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
026301440005600
Year Built
1936
Reconstructed
2009
Length
24.7 m (81 ft)
Max Span
21.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
3,778
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.