NH 12 over MILL POND

1.37 MI. FITZWILLIAM TL · County 005, New Hampshire · Built 1928 · 2 Lanes · 8,066 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
025800980008600
Year Built
1928
Reconstructed
1968
Length
17.1 m (56.1 ft)
Max Span
4.9 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
8,066
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.