NH 12 over S BR ASHUELOT RIVER

1.7MI FROM SWANZEY T.L. · County 005, New Hampshire · Built 1962 · 2 Lanes · 8,976 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
016300770006500
Year Built
1962
Length
20.4 m (66.9 ft)
Max Span
18.9 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
8,976
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.