NH101 WB over NH108

STRATHAM · County 015, New Hampshire · Built 2000 · 2 Lanes · 21,509 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
024500650007000
Year Built
2000
Length
70.1 m (230 ft)
Max Span
68 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
21,509
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.