NH101 EB over SQUAMSCOTT RIVER

At Stratham Town Line · County 015, New Hampshire · Built 1998 · 2 Lanes · 24,304 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
008201060010000
Year Built
1998
Length
268.2 m (879.9 ft)
Max Span
47.5 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
24,304
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.