I-93 NB over SALMON BROOK

3.4 MI TILTON TL · County 001, New Hampshire · Built 1962 · 2 Lanes · 14,262 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
023101270009900
Year Built
1962
Length
8.5 m (27.9 ft)
Max Span
7.3 m
Lanes
2
Daily Traffic
14,262
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.