I-93 NB over NH127

2.2MI FROM TILTON-SANBORN · County 001, New Hampshire · Built 1962 · 2 Lanes · 15,080 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
023101250007500
Year Built
1962
Reconstructed
1987
Length
33.8 m (110.9 ft)
Max Span
13.1 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
15,080
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.