NH 4 over SALMON FALLS RIVER

AT MAINE STATE LINE · County 017, New Hampshire · Built 1970 · 2 Lanes · 10,507 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
022301160008600
Year Built
1970
Reconstructed
2011
Length
50 m (164 ft)
Max Span
24.4 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
10,507
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.