FRONT STREET over SALMON FALLS RIVER
ME.-NH STATE LINE · County 017, New Hampshire · Built 1962 · 2 Lanes · 2,049 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
43.237194, -70.817711
This bridge is in worse condition than 79.4% of bridges in County 017. The average bridge in New Hampshire is 0 years old; this one is 64 years old.
Nearby Bridges
MAIN ST over SALMON FALLS RIVER
Built 1959
MAIN ST over SALMON FALLS RIVER
Built 1971
NH 4 over SALMON FALLS RIVER
Built 1970
ROLLINS ROAD over MAIN STREET CSX
Built 2000
BLACKBERRY HILL RD over BOSTON AND MAINE RR
Built 1981
NEW DAM RD over SALMON FALLS RIVER
Built 1982
BUFFUMSVILLE RD over SALMON FALLS RIVER
Built 1982
BRATTLE ST over GREAT WORKS RIVER
Built 1961
DOW HWY over GREAT WORKS RIVER
Built 2010
EMERYS BRIDGE RD over GREAT WORKS RIVER
Built 1891
Bridge Details
- Structure #
- 022301080009800
- Year Built
- 1962
- Length
- 47.5 m (155.8 ft)
- Max Span
- 22.9 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,049
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $272,000
- Total Project Cost
- $314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.