INNOVATION DRIVE over NHNCRR

0.3 MILES FROM JCT NH108 · County 017, New Hampshire · Built 2013 · 2 Lanes · 552 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
022201540017300
Year Built
2013
Length
54 m (177.2 ft)
Max Span
51.8 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
552
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.