NORTH STREET over MILLERS RIVER

0.5 MI. RTE.119 · County 005, New Hampshire · Built 2003 · 2 Lanes · 406 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
022101730007600
Year Built
2003
Length
10.4 m (34.1 ft)
Max Span
9.8 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
406
Material
Concrete
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.