US202 MAPLE ST over WATER N BR MILLERS RIVER

0.25 M W JCT GLENALLEN · County 027, Massachusetts · Built 1937 · 2 Lanes · 6,595 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
W390021A7DOTNBI
Year Built
1937
Length
13.9 m (45.6 ft)
Max Span
6 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
6,595
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,982,000
Total Project Cost
$4,474,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.