NH107 over SUNCOOK RIVER

5.4 MI FROM NORTHWOOD TL · County 013, New Hampshire · Built 1997 · 2 Lanes · 2,901 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
021200970010800
Year Built
1997
Length
24.7 m (81 ft)
Max Span
21.3 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
2,901
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.