MAIN STREET over SUNCOOK RIVER

1.3 MI N CHICHESTER TL · County 013, New Hampshire · Built 1942 · 2 Lanes · 4,409 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
021200900010400
Year Built
1942
Length
22.3 m (73.2 ft)
Max Span
12.2 m
Width
25.9 m (85 ft)
Lanes
2
Daily Traffic
4,409
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.