NH 10 over EASTMAN BROOK

1.4 MI FROM ORFORD T.L. · County 009, New Hampshire · Built 1952 · 2 Lanes · 1,247 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
020900670009300
Year Built
1952
Length
9.1 m (29.9 ft)
Max Span
9.1 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
1,247
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.