NH 25 over CONNECTICUT RIVER

VERMONT STATE LINE · County 009, New Hampshire · Built 1929 · 2 Lanes · 2,403 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
020900320010300
Year Built
1929
Reconstructed
1993
Length
108.2 m (355 ft)
Max Span
100.3 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
2,403
Material
Steel
Design
Truss - Thru
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.