NH 25A over JACOBS BROOK

4.1 MI FROM VERMONT SL · County 009, New Hampshire · Built 1925 · 2 Lanes · 1,116 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
020301210009100
Year Built
1925
Reconstructed
1986
Length
11.9 m (39 ft)
Max Span
11 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
1,116
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.