TOWN ROAD #100 over ARCHERTOWN BROOK

0.1 MI FR MILLER ROAD · County 009, New Hampshire · Built 2021 · 2 Lanes · 96 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
020301140013300
Year Built
2021
Length
6.5 m (21.3 ft)
Max Span
5.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
96
Material
Concrete
Design
Frame (except frame culverts)
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000
Total Project Cost
$314,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.